APP

ProjetHalifax Water Burnside Operations Center
AdresseJennett Ave Burnside Dartmouth NS
Surintendant du siteFred Dalessio
Entrepreneur généralBird Construction (Halifax)
20 Duke Street, Suite 201 Bedford NS B4A 2Z5 Canada
Ingénieur de projetRob Paquet
1505 Barrington Street Halifax Nova Scotia B3J 3K5 Canada
Commentaires

Roof Truss (Erectors and welding)

Marid Industries Limited (Windsor Junction). is certified to CSA Standard W47.1 “APP of companies for fusion welding of steel” in Division 1 and, therefore, does meet the requirements of CSA S16 Clause 24.3 which is referenced in the National & Provincial Building Codes Section 4.3.4.1.

NBCC Section 4.3.4.1: Building and their structural members made of structural steel shall conform to CSA S16 “Design of Steel Structures.”

CSA S16 Clause 24.3: “Fabricators and erectors responsible for welding structures fabricated or erected under this Standard shall meet the requirements of CSA W47.1, CSA W55.3 or both, as applicable in Division 1 or Division 2. Part of the work may be sublet to a Division 3 fabricator or erector; however, the Division 1 or Division 2 fabricator or erector shall retain responsibility for the sublet work.”

Contact sur le siteFred Dalessio
Représentant de la CWBScott Osmond
Date2026-03-18