Site Information Report
Project | Horton Bridge Steel Bracing repair |
---|---|
Address | Horton Bridge (KIN105) Highway 101 Kings County Between Exit 9 and 10 Nova Scotia |
Site Superintendent | Paul Ryan |
General Contractor | N.S. Department of Public Works Steel Bridge Western 445 Jubilee Road
Hebbville NS B4V 6W9
Canada |
Project Engineer | Stacey Myatt 1505 Barrington Street
Halifax NS B3J 3K5
Canada |
Comments | Repair on cover plates on Steel bracings . older shorter plates a being removed and replaced with 4ft x3/8" plates being welded with 7018 electrodes . Joints consist of fillet welds and single v-groove welds with a backing. All welders working on this project are qualified with 4GF S-class SMAW , verified at time of visit . All weldments to be visually inspected by Paul Ryan and third party visual and MPI on all weldments N.S. Department of Public Works Steel Bridge Western is certified to CSA Standard W47.1 鈥溡魽PP导航 of companies for fusion welding of steel鈥 in Division 2 and, therefore, does meet the requirements of CSA S6 鈥淐anadian Highway Bridge Design Code鈥 Clause A10.1.5.5. |
Site Contact | Paul Ryan |
CWB Representative | Scott Osmond |
Date | 2025-09-02 |